How to Lay Tiles


Generally as in painting and wallpapering, the arrangement for tiling is of amazing significance. Any grease, oil or wax must be uprooted, or cement tiles won't stick. Every high point must be sanded or planed down and the base ought to be smooth. Free floorboards ought to be nailed down, yet in the event that the floor is in terrible condition, it might be important to lay another base. You may wish to do this in any case for a more expert completion.

|

 

|

Bond boards that are 3 ft by 5ft by ¼ crawl thick are what to utilize. They ought to be screwed down each 6 inches. Before laying the boards construction regulations in many ranges require a ¼ inch indented trowel mud base of "flimsy set" mortar. The boards ought to be laid in amazed design so there are not four corners together.

|

 

|

Measuring the floor to get the centerline is important. Use chalk string so you can flip it down for a decent check. Disregard balance shapes in the floor diagram. To check you have the genuine focus, where the lines cross, measure 3 inches along one line and 4 inches along the line that is at a 90-degree point to it. At that point gauge from the end of one line, crosswise over to the end of the other one and it ought to be 5 inches. On the off chance that it is not, check your estimations once more.

|

 

|

When you are fulfilled that you have the genuine focus line, lay tiles along it every route without concrete. Along these lines you can see whether the hole between the last tile and the divider is excessively slender. It is extremely hard to cut tiles that limited, so spare yourself some dissatisfaction and move the parallel line back significantly a tile or around 4 ½ inches. Keep in mind to re-mark it.

|

 

|

 

|

When it’s time to lay the tiles properly, use them from each box in turn, then if there is a color variation, it won’t be so noticeable. Order at least 10% more tiles than you need in case of breakages and splits and to keep some for future repairs. Work out the example your tiles must be laid in before applying the tile concrete to the floor. Just do one fourth of the floor at once or else the bond might be dry out too rapidly. Abandon it until it is somewhat sticky, yet insufficient to adhere to your finger. It ought to take around 15 minutes.

|

 

|

The principal tile you lay ought to be at the focal point of the room and be precisely level with both lines. Something else, the entire floor configuration will be uneven. When you go to the last column, put a free tile butted up to the divider and over the crevice that is left, onto the last tile laid. Thusly you can stamp where to cut it. Measure every column independently to take into consideration any moment varieties.

|

 

|

To fit tiles around funnels, utilize a paper example and lay it on the tile, stamping with a pencil. At that point cut with scissors. Recall that you should not wash the floor for a week in the wake of laying tiles.